Skip to content

FIG 01 · Microsoft 365 Migration

Office 365 migration services without lost mail or surprises

A migration plan in plain English: the right method for your mailbox count, a pilot group first, and the licenses you need, not the ones a reseller wants to sell.

See how it works
IT administrator watching mail and calendars migrate to a new workspace on her laptop

FIG 02 · Quick answer

What are Office 365 migration services?

Office 365 migration services move your email, calendars, files and users into Microsoft 365. Elgrith plans cutover, staged, hybrid or IMAP moves from Exchange, Google Workspace or another tenant, tests a pilot group first, avoids licenses you don’t need, and hands over admin access, documentation and licenses in your name.

A test group moves before everyone else
Pilot first
Projects delivered since 2015
1,000+
Clients across the USA, UK and India
250+
Your tenant, admin roles and licenses
100%

FIG 03 · Why it matters

Most migration surprises are in Microsoft’s own documentation.

Three rules from Microsoft Learn and the Microsoft Lifecycle site, checked 24 Oct 2026. We plan around them before the first mailbox moves.

FIG 04 · Methods

Choosing a method: cutover, staged, hybrid or IMAP

Microsoft supports several ways to move mailboxes. The right one depends on where your mail lives today, how many mailboxes you have and how long both systems must run side by side. From Microsoft Learn (13 Jul 2026), checked 24 Oct 2026.

Microsoft 365 migration methods compared
MethodUse it whenWhat movesWatch out for
Cutover or ExpressExchange 2003 to 2013 with fewer than 2,000 mailboxes; Microsoft calls 150 or fewer more reasonableMail, calendars and contacts, all at onceEveryone switches in one window
StagedExchange 2003 or 2007 with more than 2,000 mailboxesMail, calendars and contacts, in batchesOnly for very old Exchange versions
HybridExchange 2010 with 150 to 2,000 mailboxes, small batches over time, or Exchange 2013 or laterMailboxes moved gradually while both systems runMore set-up: directory sync and hybrid configuration
Google Workspace batchesMoving from Gmail and Google CalendarMail and rules, calendar and contactsDisable retention and archival policies first
IMAPOther hosts that only offer IMAPMail folders only; no contacts, calendars or tasksMailboxes must be created first; calendars move separately
Cross-tenantMergers, divestitures and rebrands between Microsoft 365 tenantsMailboxes, and OneDrive with the same licensePaid per-user license, no exceptions

Large PST archives can go through Microsoft’s PST Import Service instead of user uploads.

Weighing the platforms first? Google Workspace vs Microsoft 365 in 2026

FIG 05 · What you get

What our Microsoft 365 migration services cover

Everything from the first mailbox count to switching off the old system, with users told what changes and when.

Archive box of paper folders beside a laptop showing a migrated mail inbox and calendar
Microsoft 365 Migration · built in-house

01

Discovery

Mailbox count and sizes, shared mailboxes, archives, file shares, DNS, devices and integrations, written into one inventory.

02

License plan

Which Business, Enterprise or Frontline plan each person needs, so you don’t buy features nobody uses.

03

Identity

Users, groups and sign-in in Microsoft Entra ID, with Entra Connect sync from on-premises Active Directory where needed.

04

DNS, MX and Autodiscover

Domain verification, MX cut-over, Autodiscover, SPF, DKIM and DMARC, timed to avoid bounced mail.

05

Mailboxes, calendars and contacts

Migration batches from Exchange, Google Workspace, IMAP or another tenant, with delta passes before cut-over.

06

Archives and PSTs

Online archives, PST imports and retention settings, so old mail stays searchable.

07

OneDrive and SharePoint

Personal files to OneDrive and team files to SharePoint, with our SharePoint consulting team for intranets and complex sites.

08

Teams

Teams and channels set up around how people work, with guest access and naming rules agreed first.

09

Devices and Outlook

Outlook profiles, mobile mail apps and device settings updated with clear steps for users.

10

Training and decommissioning

Short guides for users, an admin hand-over, then the old system switched off only after checks pass.

Deliverables

11

deliverables, in writing

Included in every build, written into your fixed quote before work starts.

FIG 06 · Sources

Where you’re moving from

Every source has its own tools and traps. We pick the method per source and test it on a pilot group before the rest of the company moves.

  • Google Workspace
  • Exchange Server
  • Another tenant
  • Exchange Online
  • OneDrive
  • Teams
  • Google Workspace to Microsoft 365

    How
    Automated batches in the Exchange admin center move mail and rules, calendars and contacts
    First
    Disable retention (MRM) and archival policies, as Microsoft strongly recommends, so items aren’t flagged as missing
  • On-prem Exchange to Microsoft 365

    Why now
    Exchange 2016 and 2019 extended support ended on 14 Oct 2025
    How
    Cutover, Express or hybrid by version and size; Exchange Server SE if some mail must stay on-premises
  • IMAP and hosted mail

    How
    IMAP migration batches into mailboxes we create first
    Limits
    IMAP moves mail only; calendars and contacts are exported and imported separately
  • Tenant-to-tenant

    When
    Mergers, acquisitions, divestitures and rebrands
    Needs
    Cross Tenant User Data Migration licenses and an organization relationship between tenants
  • File shares and drives

    From
    Network drives, Google Drive or Dropbox
    To
    OneDrive for personal files; SharePoint sites for team files, with our SharePoint team
    SharePoint Consulting
  • Forms and workflows

    From
    Old InfoPath forms, scripts or Google Apps Script
    To
    Power Apps and Power Automate, built by our Power Platform team
    Power Apps Development

FIG 07 · Tenant to tenant

Tenant-to-tenant migration

When two companies merge, split or rebrand, mailboxes and files move between Microsoft 365 tenants. It is the most planning-heavy migration type.

04principles

  • Cross-tenant licenses

    Every migrating user needs a Cross Tenant User Data Migration license, a one-time per-user fee that also covers OneDrive. Microsoft doesn’t offer exceptions (Microsoft Learn, 26 Mar 2026).

  • Organization relationship

    Both tenants are configured to trust each other for mailbox moves, with an admin on each side and a defined migration scope.

  • Domain cut-over order

    A domain can live in only one tenant, so we plan when it is removed from the source and added to the target, and what users see in between.

  • Identity matching

    Target users prepared with matching attributes before mailboxes move, so sign-in, mail flow and shared calendars keep working.

FIG 08 · Continuity

Avoiding downtime and lost mail

We plan to keep disruption small and visible, not to promise zero. These are the safeguards.

05principles

  • Pilot group first

    A small group of real users moves first, so problems surface before the whole company moves.

  • MX cut-over windows

    DNS changes scheduled for a quiet period, with record lifetimes lowered in advance so mail reroutes quickly.

  • Delta passes

    Incremental syncs after the first copy, so mail that arrives during the move is picked up before cut-over.

  • Rollback plan

    Written steps to route mail back if a cut-over goes wrong, agreed before the window starts.

  • Item-count checks

    Source and target item counts compared per mailbox, with retention policies paused so missing items mean real gaps.

FIG 09 · Licenses

Licenses and the July 2026 price change

Microsoft changed Microsoft 365 packaging and pricing from 1 Jul 2026 (announced 4 Dec 2025). In USD list prices, Business Basic went from $6.00 to $7.00 and Business Standard from $12.50 to $14.00. Pick the plan before the move, not after.

04principles

  • Right plan per person

    Frontline staff, office staff and admins often need different plans. We map each role to the smallest plan that covers it.

  • Plans without Teams

    Microsoft also lists suite plans without Teams, at different prices from the plans with it. We check whether one fits how you work.

  • Licenses in your name

    Licenses sit in your tenant and billing account, bought directly or through the reseller you choose.

  • Compare before you commit

    Our 2026 comparison covers Google Workspace and Microsoft 365 plans side by side.

    Google Workspace vs Microsoft 365

FIG 10 · After the move

After the move

A migration ends with a secure, documented tenant, not just mail in new mailboxes.

05principles

  • Security defaults and MFA

    Multifactor authentication for everyone, admin roles kept to the few who need them, and legacy sign-in blocked.

  • Backups

    Microsoft runs the service; protecting your data is a shared responsibility. We set up retention and, if you want, a third-party backup.

  • Windows 10 devices

    Microsoft 365 Apps keep getting security updates on Windows 10 until 10 Oct 2028 (Microsoft Learn, 27 Jul 2026). We plan the move to Windows 11 alongside.

  • Ongoing admin

    User changes, licensing and security reviews from our managed IT services team.

    IT services
  • Built by the team behind our flagship

    Kenerate AI, our flagship build, designed and engineered by Elgrith. It is an AI image and video studio, not a Microsoft 365 migration project.

    See Kenerate AI

FIG 11 · Measurement

What we measure during a Microsoft 365 migration

Every mailbox accounted for, every user able to work. That is what we report, batch by batch.

How we measure a Microsoft 365 migration
How we measure itWhat we won’t do
CompletenessItem counts per mailbox, source vs target, after each batchCall a batch done before the counts are checked
Mail flowTest messages in and out after every DNS changeChange MX records outside an agreed window
User readinessPilot feedback and help requests per batchMove everyone before the pilot group signs off
SecurityMFA coverage and admin role count at hand-overLeave shared admin accounts behind
DisruptionPlanned and unplanned mail outages during cut-oversPromise “zero downtime” or “zero data loss”

We agree the measures, batch plan and cut-over windows in your written scope.

FIG 12 · Process · 6 steps

Pilot first, then move in batches

Free call, discovery, fixed written quote, then a pilot group and batches shown in weekly check-ins, with a rollback plan for every cut-over.

  1. Step 01

    Free call

    Tell us where your mail and files live today, how many people you have and what must not break. We ask about deadlines, mergers and devices first.

  2. Step 02

    Discovery

    Discovery: mailbox and file inventory, DNS, identity, devices, licenses and integrations, then a method chosen per source.

  3. Step 03

    Fixed written quote

    A written scope and a fixed quote, with the timeline, access and hand-over agreed before any work starts. You own the code and IP, and your tenant, admin roles and licenses stay in your name.

  4. Step 04

    Sprints with weekly demos

    Identity, DNS preparation and a pilot group first, then migration batches with delta passes, each reviewed with you weekly.

  5. Step 05

    Launch

    MX cut-over in an agreed window, final delta sync, item-count checks and user guides on the day.

  6. Step 06

    Support

    Old system decommissioned after checks pass, then ongoing admin or a hand-over to your team, as agreed in your written scope.

FIG 13 · What you get

Everything included

Written into your fixed quote, so you know exactly what you are paying for before work starts.

11items

  • Written scope and fixed quote
  • Mailbox, file and device inventory
  • License plan per role
  • Migration method per source
  • Identity set-up in Entra ID
  • DNS, MX, SPF, DKIM and DMARC plan
  • Pilot group and batch schedule
  • Item-count reports per batch
  • Rollback plan for every cut-over
  • User guides and admin hand-over
  • Your tenant, admin roles and licenses stay in your name

FIG 14 · Tech & tools

The tools behind the work

Proven, well-supported tools, chosen for your project and set up in accounts your business owns.

  • Microsoft 365
  • Exchange Online
  • Exchange admin center
  • Microsoft Entra ID
  • Entra Connect
  • OneDrive
  • SharePoint
  • Microsoft Teams
  • Exchange Online PowerShell
  • Microsoft Graph
  • PST Import Service
  • Intune
  • Google Workspace
  • Exchange Server SE

FIG 15 · Who it’s for

Microsoft 365 migrations for teams that can’t stop working.

Same method everywhere: discover first, pilot first, check every batch.

4 audiences

Small business

Off Gmail or an old host, onto Microsoft 365.

A simple, planned move for teams of a handful to a few hundred people, with mail, calendars and files moved and everyone shown what changes.

  • Right plan per person
  • Pilot group first
  • DNS done for you
  • Short user guides

FIG 16 · Working with us from the USA and UK

Built in New Delhi. Run on your hours.

Every project gets a point of contact in New York or London and an engineering team in New Delhi. Here is how today’s working days line up, live.

Three ways to work together

  1. 01

    Fixed-scope project

    A written scope, one fixed price and a dated plan. Suits websites, apps and MVPs.

  2. 02

    Dedicated team

    Designers and engineers on your roadmap every month, billed monthly.

  3. 03

    White label

    For US and UK agencies: our work, your brand, unbranded deliverables.

Every engagement

  • Fixed quote in USD, GBP or INR after a free 30-minute call
  • NDA before discovery. You own all code, designs and content
  • A working demo every sprint, not status slides
  • Reply within one business day, calls inside your hours
Book a call

Calls on ET or UK hours

FIG 17 · Checklist

Microsoft 365 migration checklist

A short Microsoft 365 migration checklist you can work through before you talk to anyone. We run the full version in discovery.

Microsoft 365 migration checklist
StageCheckWhy it matters
InventoryCount mailboxes, shared mailboxes, archives and total data sizeSize and source decide the method
LicensesMap each role to a plan; buy cross-tenant licenses if moving between tenantsCross-tenant moves fail without the license
IdentityClean up old accounts and decide on Entra Connect syncDuplicates and stale users break sign-in
PoliciesPause retention (MRM) and archival policies on the sourceOtherwise items look missing after the move
DNSLower record lifetimes, verify domains, plan MX and AutodiscoverMail reroutes quickly at cut-over
PilotMove a small group of real users firstProblems surface before everyone moves
Cut-overFinal delta sync, MX switch, item-count checksNothing arriving mid-move is lost
AfterMFA for everyone, admin roles trimmed, backups decided, old system switched offA secure tenant, not just moved mail

FIG 18 · Rules and dates

Microsoft 365 migration rules and dates (checked 24 Oct 2026)

Support dates, licensing rules and price changes that affect your migration plan, from Microsoft’s own pages, checked 24 Oct 2026. General guidance from public sources, not legal advice; your counsel confirms what applies to you.

Microsoft 365 migration rules and dates (checked 24 Oct 2026)
What changedWhenSourceWhat it means for you
Exchange Server 2016 and 2019 extended support ended14 Oct 2025 (US time)Microsoft LifecycleNo more security fixes: migrate or upgrade
Exchange Server Subscription Edition in support (Modern Lifecycle Policy)Since 1 Jul 2025Microsoft LifecycleThe supported path if mail must stay on-premises
Microsoft 365 price and packaging update in effect1 Jul 2026 (announced 4 Dec 2025)Microsoft licensing newsCheck plans and costs before you move
Cross-tenant moves need a one-time per-user license; no exceptions26 Mar 2026Microsoft Learn, Cross-tenant mailbox migrationBudget for licenses before a merger migration
Cutover up to 2,000 mailboxes; 150 or fewer “more reasonable”; IMAP moves mail only13 Jul 2026Microsoft Learn, Mailbox migration methodsLarger moves need hybrid or batches
Google Workspace moves: disable MRM and archival policies firstChecked 24 Oct 2026Microsoft Learn, Google Workspace migrationAvoids items reported as missing
Microsoft 365 Apps security updates on Windows 10 continueUntil 10 Oct 2028Microsoft Learn, 27 Jul 2026Plan Windows 11 alongside the migration

Sources: Microsoft Lifecycle, Microsoft Learn and Microsoft licensing news, all checked 24 Oct 2026. Next check: January 2027.

FIG 19 · Compare

Microsoft’s built-in tools vs third-party migration tools vs users moving their own mail

Microsoft’s built-in tools vs third-party migration tools vs users moving their own mail
Built-in tools (Exchange admin center)Third-party migration toolsUsers move their own mail
CostIncluded with Microsoft 365Per-user tool feesNo tool fees, high staff time
CoversExchange, Google Workspace, IMAP and cross-tenant batchesExtra sources, file shares and finer schedulingWhatever each person remembers to export
Best forMost small and mid-size movesComplex estates or sources the built-in tools don’t reachA handful of personal mailboxes
RiskLow, with a pilot and item-count checksLow, but one more vendor to manageHigh: missed items and no audit trail

FAQ

Frequently asked questions

Straight answers about Microsoft 365 Migration with Elgrith.

Microsoft supports cutover (or Express) migration, staged migration, hybrid migration, IMAP migration, Google Workspace batch migration and cross-tenant migration, plus PST imports. Which one fits depends on your source system, Exchange version and mailbox count.

Free 30-minute call

Tell us where your mail lives today. We’ll plan the move.

Share your current system, user count and deadline. After a free call you get a written migration scope and a fixed quote.

connect@elgrith.com+91 96039 20001Start a project

Pick a day for your call

Open

Pick a day. You'll choose a time in your own time zone on the next step.

See all times